GH-Thermal Power SIL 5 (FY95)
Sector: Power Generation (CCGT) • Location: Ghana
Source: World Bank Group
The objectives of the Thermal Power Project are to: enable the Volta River Authority (VRA) to maintain the country's electricity supply by providing the generating capacity to meet the electricity demand in Ghana; enhance operational efficiency through transmission and generation system improvements; moderate demand growth through economic demand management programming; strengthen the institutiona
- Status
- Closed
- Sector
- Power Generation (CCGT), Wind, Geothermal, Commercial, Hydro, Government
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about GH-Thermal Power SIL 5 (FY95)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Thermal Power Project are to: enable the Volta River Authority (VRA) to maintain the country's electricity supply by providing the generating capacity to meet the electricity demand in Ghana; enhance operational efficiency through transmission and generation system improvements; moderate demand growth through economic demand management programming; strengthen the institutional capabilities of the power sector and of VRA by supporting its ongoing program of institutional development to meet the requirements for the mid 1990s and beyond. The project consists of the construction at Takoradi of 300 MW combined-cycle generation capacity, consisting of two combustion turbine generator sets of 100 MW each, a heat recovery boiler and a steam turbine generator to produce an additional 100 MW; generation-associated transmission and associated sub-stations; consulting engineering services to manage and supervise project; and managerial and technical services for the operation and maintenance of the power station. The project will also include components on the development of suitable regulatory arrangements and private participation in the power sector, a program for demand-side management and support for VRA's program of institutional development and capacity building through training and technical assistance. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Ghana |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Geothermal, Commercial, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
