GH2 Solar, AHES 500-MW Electrolyser Factory in India
Sector: Solar • Location: Gwalior, Madhya Pradesh, India
Source: Renewables Now
India-based renewable energy company GH2 Solar Limited and South Korea-based Advanced Hydrogen Energy Solutions (AHES) Ltd have entered into a joint venture to build a green hydrogen electrolyser manufacturing facility in India, targeting an overall production capacity of 500 MW by 2030. The facility will also host a GWh-level battery storage assembly line. The project will start with an annual ma
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | India-based renewable energy company GH2 Solar Limited and South Korea-based Advanced Hydrogen Energy Solutions (AHES) Ltd have entered into a joint venture to build a green hydrogen electrolyser manufacturing facility in India, targeting an overall production capacity of 500 MW by 2030. The facility will also host a GWh-level battery storage assembly line. The project will start with an annual manufacturing capacity of 105 MW, awarded under Solar Energy Corporation of India’s (SECI) Strategic Interventions for Green Hydrogen Transition (SIGHT) programme, and will receive INR 1.575 billion production-linked incentive subsidy. The factory will manufacture advanced alkaline electrolyser technology, with future expansion into proton exchange membrane (PEM) and other generation systems. The total investment is estimated at INR 4 billion, with INR 1 billion allocated in the first phase to set up a 3-GWh battery energy storage system assembly line, and the remaining INR 3 billion to be spent in phases to expand the site by 2030. The project was formally presented at a ceremony in Gwalior attended by company executives and state officials. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
