logo
Project

Ghana - Accra Sewerage Improvement Project (ASIP)

Sector: Waste Processing and Treatment • Location: Ghana

Source: African Development Bank (AfDB)

The Accra Sewerage Improvement Project (ASIP) follows the National Environmental Sanitation Policy. The project represents a top priority of the Government as stipulated in the Ghana Poverty Reduction Strategy II (2005-2009). It aims at implementing the institutional reforms and rehabilitating and expanding the sewerage and sanitation systems in Accra. The ASIP project will provide two new major S

Sector
Waste Processing and Treatment, Water Supply and Storage, Education, Commercial, Government
Location
Ghana
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Ghana - Accra Sewerage Improvement Project (ASIP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ghana - Accra Sewerage Improvement Project (ASIP)” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Ghana. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Accra Sewerage Improvement Project (ASIP) follows the National Environmental Sanitation Policy. The project represents a top priority of the Government as stipulated in the Ghana Poverty Reduction Strategy II (2005-2009). It aims at implementing the institutional reforms and rehabilitating and expanding the sewerage and sanitation systems in Accra. The ASIP project will provide two new major Sewage Treatment Plants (STPs) at Densu Delta and Legon to cover the 2020 design horizon. The existing institutional small treatment plants scattered across Accra city will be gradually phased out. The proposed treatment concept is based on waste stabilization ponds with an outfall discharging into the sea in the case of Densu Delta STP and into water courses in the case of Legon STP. The project will comprise six components as follows: (i) Treatment Plants and Pumping Stations, (ii) Sewerage Networks and Sanitation Facilities, (iii) Environmental Measures, (iv) Institutional Strengthening, (v) Engineering Services, and (vi) Project Management. Its implementation will help achieve the national targets by providing improved sanitation and sewerage facilities in the project area.

Original sector

Water Supply & Sanitation

Budget

Location

Country

Ghana

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Education, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project