logo

Ghana - Three Roads Study

Sector: Raw Materials • Location: Ghana

Source: African Development Bank (AfDB)

Project

The present project concerns the three Roads Study. It’s in line with the Bank’s strategy for Ghana which aims at enhancing agricultural production, socio-economic advancement and poverty reduction and is in consonant with the Government’s Road Sector Investment Programme. The study aims to determine the technical feasibility and economic viability of improving to higher standards 353 km of roads

Project Information FAQ

Project Information

4 Q
The project “Ghana - Three Roads Study” is an infrastructure initiative in the Raw Materials sector, located in Ghana. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project concerns the three Roads Study. It’s in line with the Bank’s strategy for Ghana which aims at enhancing agricultural production, socio-economic advancement and poverty reduction and is in consonant with the Government’s Road Sector Investment Programme. The study aims to determine the technical feasibility and economic viability of improving to higher standards 353 km of roads in the Northern and Upper Western and Western Regions of Ghana. The development and rehabilitation of infrastructure in the transport sector supports Government’s efforts of transition from adjustment to accelerated growth and poverty reduction. The study should therefore facilitate the identification of appropriate rehabilitation strategies for implementation so that they positively impact their areas of influence. It should be conducted on the three roads, namely: a) Wa-Han (70-Km); b) Lawra-Tumu (116-Km) and c) Sawla-Fufulso (167-Km). The study should be conducted in the following two stages. The stage I concerns the Feasibility Study, Environmental Impact Assessment Study and Impact on Poverty Reduction and Gender Study. The stage II is related to the Detailed Engineering Designs, Cost Estimates and Preparation of Tender Documents for the above-mentioned roads.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data