logo
ProjectCompleted

Ghana BDC II

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The proposed project involves renewing the existing Master Risk Participation Agreement with Standard Chartered Bank for Letters of Credit facilities to Ghanaian bulk distribution companies (“BDCs”) for importing petroleum products into Ghana, for another 3 years starting from June 2013. The BDC in consideration is Chase.Chase, a Ghanaian BDC based in Accra, is a leading bulk distributor of petro

Status
Closed
Sector
Raw Materials, Commercial, Chemical (Industrial), Road, Manufacturing (Industrial), Oil and Gas, Government
Location
Ghana
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Ghana BDC II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ghana BDC II” is an infrastructure initiative in the Raw Materials sector, located in Ghana. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project involves renewing the existing Master Risk Participation Agreement with Standard Chartered Bank for Letters of Credit facilities to Ghanaian bulk distribution companies (“BDCs”) for importing petroleum products into Ghana, for another 3 years starting from June 2013. The BDC in consideration is Chase.Chase, a Ghanaian BDC based in Accra, is a leading bulk distributor of petroleum products that owns the Tema Terminal Farm. This terminal is a fuel storage facility with a total capacity of 70,000 m3 distributed as follows: two 10,000 m3 gasoline above storage tanks (ASTs), two 20,000 m3 gas oil ASTs, and a 5,000 m3 AST for gasoline and gas oil respectively. In addition, it anticipates building two more 25,000 m3 ASTs by the end of 2013. The terminal is located in area of some 20 acres in the Heavy Industrial Zone of Kpone within the Tema municipality. The site is adjacent to Kpone Marine Services Limited with the Gao lagoon to the south and the Kpone-Tema road to the north. The closest community is located 7 km from the project site.The terminal has a pipeline network linking the storage tanks to the Conventional Buoy Mooring (CBM) intake point via Kpone Marine Services Limited. Kpone Marine Services Limited is in charge of the offloading from vessels to Chase storage tanks. Two 18 inch pipelines each feed the ASTs with gasoline and gas oil. The fuel is retrieved from the terminal by tanker trucks connecting to a six island “top loading”, loading gantry. The gantry has the capability to install six more islands. As part of the installations, Chase also has a spacious tanker truck park, able to accommodate up to 150 trucks, located diagonally opposite to the tank farm across the Tema-Kpone road. The Gao Lagoon, located at the south of the terminal, is approximately 1 km distant from the tank farm and has sparse mangrove growth. The lagoon has aquatic life (i.e., crabs, snails, etc) and provides support for several bird species. None of the lagoon associated species is listed in any of the IUCN listings or it is indicated as being in need of preservation.

Original sector

G-HA - All Other Chemical Product

Location

Country

Ghana

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial, Chemical (Industrial), Road, Manufacturing (Industrial), Oil and Gas, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project