Ghana Urban Transport Project
One of 4,244 projects Taiyo tracks in Ghana.
Source: World Bank
The key objective of the Urban Transport Project is to: Improve mobility in areas of participating metropolitan, municipal or district assemblies (MMDAs) through a combination of traffic engineering measures, management improvements, regulation of the public transport industry, and implementation of a Bus Rapid Transit (BRT) system. The key GEF objective is to: Promote a shift to more environmenta
- Status
- Closed
- Sector
- Mass Transit, Road, Automotive, Government, Education
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Ghana Urban Transport Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The key objective of the Urban Transport Project is to: Improve mobility in areas of participating metropolitan, municipal or district assemblies (MMDAs) through a combination of traffic engineering measures, management improvements, regulation of the public transport industry, and implementation of a Bus Rapid Transit (BRT) system. The key GEF objective is to: Promote a shift to more environmentally sustainable urban transport modes and encourage lower transport-related Greenhouse Gas (GHG) emissions along the pilot BRT corridor in Accra. The project has five components: i) Institutional development which will strengthen capacity of Ministries and agencies concerned with urban transport, transport operators and MMDAs; ii) Traffic Engineering, Management and Safety whose subcomponents are (a) traffic management in the Accra MMDA areas; (b) area-wide traffic signal control in the Accra MMDA areas; (c) traffic management in the Kumasi MMDA areas; (d) area-wide traffic signal control in the Kumasi Metropolitan Area; (e) enforcement of traffic rules and education; and ( f ) design and supervision of works under sub-components (a) through (e); iii) Development of BRT system whose subcomponents are as follows: (a) BRT infrastructure implementation (including segregated bus-ways, interchange facilities, and terminals and facilities for pedestrians); iv) Integration of Urban Development and Transport Planning for Better Environmental Management v) Project outcome monitoring whose subcomponents are studies to support the monitoring of project outcomes through evaluation of (a) transport and social impact indicators, (b) environmental impact indicators, and (c) capacity development indicators. |
Original sector | FY17 - Public Administration,FY17 - Transportation |
Budget |
Location
Country | Ghana |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Automotive, Government, Education |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Ghana
- Meridian Development Limited
- Ghana - Road Infrastructure Project (Eastern and Western Regions)
- Ghana - Electricity Distribution System Reinforcement and Extension Project
- Tema Port Expansion
- Tema-Ouagadougou Railway
- Tema-Mpakadan Railway Project, Ghana
- Ghana - The Akatsi-Dzodze-Noepe Road Upgrading Project
- Two Roads Studies
