logo

Ghatampur Thermal Power Project Unit-2

Sector: Geothermal • Location: Ghatampur, Uttar Pradesh, India

Source: PSU Connect

Project
Operational

Unit-2 (660 MW) of the 1,980 MW Ghatampur Thermal Power Project has commenced commercial operations, making the first two units (Unit-1 and Unit-2) totaling 1,320 MW fully operational. The project is managed by Neyveli Uttar Pradesh Power Limited (NUPPL), a joint venture between NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited. Unit-3 is expected to be completed in FY 2025-26

Status
Under Construction
Sector
Geothermal, Power Generation (CCGT), Commercial
Location
Ghatampur, Uttar Pradesh, India
Updated
22 Jul 2026
Source
PSU Connect

ConstructChat

Ask ConstructChat about Ghatampur Thermal Power Project Unit-2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ghatampur Thermal Power Project Unit-2” is an infrastructure initiative in the Geothermal sector, located in Ghatampur, Uttar Pradesh, India. Taiyo aggregates data on it from PSU Connect.

Participants

Not available for this record.

Status

Original status

operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Unit-2 (660 MW) of the 1,980 MW Ghatampur Thermal Power Project has commenced commercial operations, making the first two units (Unit-1 and Unit-2) totaling 1,320 MW fully operational. The project is managed by Neyveli Uttar Pradesh Power Limited (NUPPL), a joint venture between NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited. Unit-3 is expected to be completed in FY 2025-26, increasing total capacity to 1,980 MW and enhancing power supply to Uttar Pradesh and Assam.

Original sector

Energy

Location

Country

India

State

Uttar Pradesh

City

Ghatampur

Source

Source

PSU Connect

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Commercial

Article published date

2025-12-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project