Ghazi Barotha Hydropower Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The main objectives of the Ghazi-Barotha Hydropower Project are to assist the government of Pakistan (GOP) in its efforts to: 1) develop domestic energy resources and reduce load-shedding in a cost-effective and environmentally sustainable manner, thereby supporting the country's long-term energy development objectives; 2) reinforce and complement the reform program for the power sector; 3) streng
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ghazi Barotha Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Ghazi-Barotha Hydropower Project are to assist the government of Pakistan (GOP) in its efforts to: 1) develop domestic energy resources and reduce load-shedding in a cost-effective and environmentally sustainable manner, thereby supporting the country's long-term energy development objectives; 2) reinforce and complement the reform program for the power sector; 3) strengthen the Water and Power Development Authority's (WAPDA) capability to address environmental and resettlement issues related to hydropower projects; and 4) further rationalize the use of electricity. The project will consist of: 1) the construction of the Ghazi Barotha Hydropower Project (GBHP) which comprises the following four main components: a) a barrage and its ancillary works; b) a 52 km long concrete-lined power channel with a capacity of 1,600 cumecs and its ancillary works; c) a power complex and its ancillary works; and d) the construction of power transmission facilities to connect GBHP to the interconnected grid; 2) the implementation of an environment and resettlement management plan including: a) an environment mitigation and monitoring plan; b) a resettlement action plan (RAP); and c) and integrated regional development plan (IRDP); 3) the power sector component which involves setting up of GBHP as a separate project entity and the establishment of a separate transmission and despatch entity; and 4) a technical assistance component consisting of consultancy services. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Cement, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
