GHM
The status, timeline and source of this project. A free account opens every field.
Source: IFC Project Disclosures
The proposed investment is a US$15 million IFC A Loan to Grands Hotels de Mauritanie SA (“GHM” or the “Company”). GHM is a special purpose vehicle established to develop a 200-key Edge-certified upper upscale hotel in Nouakchott (the "Hotel") and operated by Marriott International (the “Operator”) under the Sheraton brand (the “Project”). The majority shareholder of GHM is Société Nationale Indus
- Status
- Prospective
- Sector
- Bridge, Hotel
- Location
- Mauritania
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about GHM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed investment is a US$15 million IFC A Loan to Grands Hotels de Mauritanie SA (“GHM” or the “Company”). GHM is a special purpose vehicle established to develop a 200-key Edge-certified upper upscale hotel in Nouakchott (the "Hotel") and operated by Marriott International (the “Operator”) under the Sheraton brand (the “Project”). The majority shareholder of GHM is Société Nationale Industrielle et Minière (“SNIM” or the “Sponsor”). Proceeds of the proposed US$15 million IFC A Loan will be used to settle an existing bridge loan which was raised by GHM to complete the development of the Hotel. The Hotel features restaurants, swimming pools, and shops. The design and construction of the Hotel were managed by GHM, in collaboration with the Operator. Construction of the Hotel started in 2017; however, due to the COVID-19 pandemic, construction was halted and subsequently restarted in 2023. The construction of the Hotel was completed in September 2025 and had a soft opening in October 2025. In January 2026, the Hotel had a 20% occupancy rate. |
Original sector | U-AA - City and Business Hotel |
Location
Country | Mauritania |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Bridge, Hotel |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
