logo

GHM

Sector: Water Supply and Storage • Location: Mauritania

Source: International Finance Corporation (IFC)

Project
Pending

The proposed investment is a US$15 million IFC A Loan to Grands Hotels de Mauritanie SA (“GHM” or the “Company”). GHM is a special purpose vehicle established to develop a 200-key Edge-certified upper upscale hotel in Nouakchott (the "Hotel") and operated by Marriott International (the “Operator”) under the Sheraton brand (the “Project”). The majority shareholder of GHM is Société Nationale Indus

Project Information FAQ

Project Information

4 Q
The project “GHM” is an infrastructure initiative in the Water Supply and Storage sector, located in Mauritania. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pending

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed investment is a US$15 million IFC A Loan to Grands Hotels de Mauritanie SA (“GHM” or the “Company”). GHM is a special purpose vehicle established to develop a 200-key Edge-certified upper upscale hotel in Nouakchott (the "Hotel") and operated by Marriott International (the “Operator”) under the Sheraton brand (the “Project”). The majority shareholder of GHM is Société Nationale Industrielle et Minière (“SNIM” or the “Sponsor”). Proceeds of the proposed US$15 million IFC A Loan will be used to settle an existing bridge loan which was raised by GHM to complete the development of the Hotel. The Hotel features restaurants, swimming pools, and shops. The design and construction of the Hotel were managed by GHM, in collaboration with the Operator. Construction of the Hotel started in 2017; however, due to the COVID-19 pandemic, construction was halted and subsequently restarted in 2023. The construction of the Hotel was completed in September 2025 and had a soft opening in October 2025. In January 2026, the Hotel had a 20% occupancy rate.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data