logo

Ghost Town Trail Culvert

Sector: Rail • Location: Jackson Township, Pennsylvania, United States of America

Source: Dodge USA

Project
Closed

The Ghost Town Trail Culvert project consists of construction of the installation of 40 feet of 48 inch diameter stormwater pipe, trail restoration, stone headwalls, rip-rap, erosion and sedimentation controls, and restoration work. Work under this contract shall include all materials, equipment, supplies, and labor for the construction as shown and specified in the Contract Documents. The project

Status
Closed
Sector
Rail, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Mass Transit
Location
Jackson Township, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Ghost Town Trail Culvert

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ghost Town Trail Culvert” is an infrastructure initiative in the Rail sector, located in Jackson Township, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ghost Town Trail Culvert project consists of construction of the installation of 40 feet of 48 inch diameter stormwater pipe, trail restoration, stone headwalls, rip-rap, erosion and sedimentation controls, and restoration work. Work under this contract shall include all materials, equipment, supplies, and labor for the construction as shown and specified in the Contract Documents. The project is located in Jackson Township, Cambria County, Pennsylvania.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Jackson Township

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Rail, Government, Commercial, Waste Processing and Treatment, Water Supply and Storage, Mass Transit

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project