logo

Ghubrah III Independent Water Project (IWP)

Sector: Water Supply and Storage • Location: Oman

Source: Smart Water Magazine

Project
Under Construction

The Ghubrah III IWP is currently under construction and scheduled to begin commercial operations in 2027 with a capacity of 300,000 m³/day to boost capacity in the Main Interconnected System (MIS) in Oman.

Status
Under Construction
Sector
Water Supply and Storage, Power Generation (CCGT), Commercial
Location
Oman
Updated
22 Jul 2026
Source
Smart Water Magazine

ConstructChat

Ask ConstructChat about Ghubrah III Independent Water Project (IWP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Ghubrah III Independent Water Project (IWP)” is an infrastructure initiative in the Water Supply and Storage sector, located in Oman. Taiyo aggregates data on it from Smart Water Magazine.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ghubrah III IWP is currently under construction and scheduled to begin commercial operations in 2027 with a capacity of 300,000 m³/day to boost capacity in the Main Interconnected System (MIS) in Oman.

Original sector

Water

Location

Country

Oman

Source

Source

Smart Water Magazine

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Commercial

Article published date

2026-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project