Gibson Road at SR-113 Interchange Modification
Sector: Water Supply and Storage • Location: Woodland, California, United States of America
Source: Dodge USA
Gibson Road Interchange Project Gibson Rd & SR 113; CIP 19-13 Project will realign the Northbound off-ramp from SR 113 by removing the free right turn ramp and align the off-ramp movement to utilize the traffic signal. New signal, curb, gutter, and multiuse path will be installed along the south side of Gibson Rd. from the ramp terminal to Harry Lorenzo Ave.DESCRIPTION OF WORK This project shall b
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Gibson Road Interchange Project Gibson Rd & SR 113; CIP 19-13 Project will realign the Northbound off-ramp from SR 113 by removing the free right turn ramp and align the off-ramp movement to utilize the traffic signal. New signal, curb, gutter, and multiuse path will be installed along the south side of Gibson Rd. from the ramp terminal to Harry Lorenzo Ave.DESCRIPTION OF WORK This project shall be conducted in accordance with the plans, specifications and other contract documents, all of whi... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
