logo

Gibsons - White Tower Stormwater Pond

Sector: Waste Processing and Treatment • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The project will increase the capacity to manage and treat stormwater by intercepting stormwater and re-routing it into the White Tower Stormwater pond. The improvements will protect Charman Creek from increased sediment load and will protect approximately 1 kilometer of downstream properties from flood risk through regulating the flow of stormwater entering the system. The project works include:

Project Information FAQ

Project Information

3 Q
The project “Gibsons - White Tower Stormwater Pond” is an infrastructure initiative in the Waste Processing and Treatment sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will increase the capacity to manage and treat stormwater by intercepting stormwater and re-routing it into the White Tower Stormwater pond. The improvements will protect Charman Creek from increased sediment load and will protect approximately 1 kilometer of downstream properties from flood risk through regulating the flow of stormwater entering the system. The project works include: - environmental protection including flow diversion; - construction of a headwall for pond outfall; - weir/oriface plate; - installation of a water quality treatment system; - clearing, grubbing, site preparation, grading and landscaping including grass, trees and benches; - excavating, granular base where needed, and rip rap in various sections of the project; - installation of storm and sewer piping and manholes/catchbasins as required; - pond outlet overflow and grate; and, - related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data