GigaPop Data Center
Sector: Power Generation (CCGT) • Location: Ferris, Texas, United States of America
Source: Dodge
Cutting-edge communications infrastructure campus in South Dallas. The facility will deliver more than 800,000 square feet of data center and tech space, and up to 540 megawatts (MW) of total power. Under the agreement, Gigabit will contribute 131 acres of fully entitled land for the project, located in Red Oak, Texas along the newly opened Loop 9 highway, strategically positioned in the heart of
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Data Center, Manufacturing (Industrial), Commercial
- Location
- Ferris, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about GigaPop Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cutting-edge communications infrastructure campus in South Dallas. The facility will deliver more than 800,000 square feet of data center and tech space, and up to 540 megawatts (MW) of total power. Under the agreement, Gigabit will contribute 131 acres of fully entitled land for the project, located in Red Oak, Texas along the newly opened Loop 9 highway, strategically positioned in the heart of the South Dallas data center cluster. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Ferris |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Data Center, Manufacturing (Industrial), Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
