Gigawatt Global 71 MW Hybrid Wind/Solar Project
Closed · Zambia
Source: United Nations Industrial Development Organization (UNIDO)
Gigawatt Renewables Zambia Limited was incorporated on 30 May 2018, to be the special project company for the establishment of a solar-wind hybrid plant project in Chibombo District. Gigawatt Renewables Ltd is owned 100% by Gigawatt Global Cooperatief U.A., registered in the Netherlands. Gigawatt Global signed a land lease option agreement with Kambwese Farm, a commercial farm currently cultivatin
- Status
- Closed
- Sector
- Commercial, Consumer Products, Fertilizers, Government, Power Generation (CCGT), Wind, Power Transmission, Raw Materials, Solar, Aerospace & Defense, Airport, Residential, Manufacturing (Industrial)
- Location
- Chibombo, Zambia
- Updated
- 22 Jul 2026
- Source
- United Nations Industrial Development Organization (UNIDO)
ConstructChat
Ask ConstructChat about Gigawatt Global 71 MW Hybrid Wind/Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gigawatt Renewables Zambia Limited was incorporated on 30 May 2018, to be the special project company for the establishment of a solar-wind hybrid plant project in Chibombo District. Gigawatt Renewables Ltd is owned 100% by Gigawatt Global Cooperatief U.A., registered in the Netherlands. Gigawatt Global signed a land lease option agreement with Kambwese Farm, a commercial farm currently cultivating wheat and soya crops and cattle ranching. A wind mast was installed on the land in 2017 by the Renewable Energy Resource Mapping (ESMAP) program, led by World Bank Group and its partners. This is the best performing mast in Zambia, with data collected at 80m, and the site, essentially flat and situated at high elevation (1180m), is suitable for solar PV and wind. A solar yield assessment has been performed by DNV GL for the site design. Satelite solar resource data was used with an estimated yearly GHI of 2,184 kWh/m2, and the average yearly temperature on site is 20.8 °C. The solar field will have a capacity of 40 MWp AC, with 48.2 MWp DC installed on east-west orienting trackers. There will be two 33 kV circuits for the wind farm and two for the solar farm. The two wind circuits and the two solar circuits will connect to a 45 MVA transformer each, to step up the voltage from 33 kV to 132 kV at the on-site substation at the south-east corner of the project site. The off-taker for the electricity is the government-owned power utility, ZESCO, which is responsible for electricity distribution, and produces 80% of the electricity in Zambia. The time from financial close (FC) to Commercial Operation Date (COD) for the hybrid plant is expected to be 18 months, including both the wind and solar components together with the grid interconnection. The plant life has been estimated at 25 years. The total estimated cost for the development of the project is $90 million. The project is open for FDI through majority stake. |
Original sector | Production, transmission and distribution of electricity |
Location
Country | Zambia |
City | Chibombo |
Source
Source reliability | High |
Source | United Nations Industrial Development Organization (UNIDO) |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Fertilizers, Government, Power Generation (CCGT), Wind, Power Transmission, Raw Materials, Solar, Aerospace & Defense, Airport, Residential, Manufacturing (Industrial) |
Article published date | 2023-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Zambia
- Open for FDI through a majority stake/Development of a new project/Production, transmission and distribution of electricity/DEVELOPMENT OF CHIPOTA FALLS 200 KW MINI-HYDRO PROJECT
- Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia
- RISE AND SHINE SCHOOL PROJECT
- Sale of Majoru Investments Limited
- Luswishi Farm Project
- Shangombo Sugar Project
- Reliable Supply of Beef and Pork to Local and Foreign Shops
- Umlimi Char-Briquettes Project