GILMAN SPRINGS ROAD RESURFACING PROJECT
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: State Route 79 to 1 mile South of State Route 60 Length: Approximately 9 miles District: 5 Communities: Gilman Hot Springs, Laborde Canyon, Eden Hot Springs, Jack Rabit Trail, BadlandsThe County of Riverside Transportation Department is proposing to resurface approximately 6 miles of Gilman Springs Road and microsurface approximately 3 miles from State Route 79 to 1 mile south of State Ro
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: State Route 79 to 1 mile South of State Route 60 Length: Approximately 9 miles District: 5 Communities: Gilman Hot Springs, Laborde Canyon, Eden Hot Springs, Jack Rabit Trail, BadlandsThe County of Riverside Transportation Department is proposing to resurface approximately 6 miles of Gilman Springs Road and microsurface approximately 3 miles from State Route 79 to 1 mile south of State Route 60. Gilman Springs Road is classified as an Arterial Highway in the County of Riverside’s General Plan. Gilman Springs Road is currently 32 feet wide with dike along various segments of the roadway. The proposed project will include overlaying the entire roadway width with Rubberized Hot Mix Asphalt (RHMA) over Hot Mix Asphalt (HMA). Additionally in areas with severe distress, the roadway will be removed and placed back with HMA before the overall overlay of the roadway. The project will also include: · Microsurfacing of the roadway · Construction of some driveways, driveway tie-ins, and side street tie-ins · Reconstruction and/or construction of asphalt concrete dike, over-side drains, and down drains · Placement safety edge and shoulder backing · Replacement of guardrails and end treatments · Removal of existing thermoplastic markings, painted stripes, and reflective markers · Striping of roadway, including pavement markers, reflectors, and rumble stripes · Replacement of signs and detector loops No additional right-of-way will be required to construct the proposed improvements. The project will remain within the existing footprint and will raise the road profile by 0.27 feet in the resurfacing areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
