logo

Gippsland Decommissioning Campaign #1 Project

Sector: Oil and Gas • Location: Australia

Source: World Oil

Project
Planned

The Gippsland Decommissioning Campaign #1 Project involves the planned removal of up to 13 offshore platforms starting in 2027 as part of retiring aging offshore infrastructure within the Gippsland Basin Joint Venture. The campaign targets approximately 60,000 tonnes of offshore structures with a recycling rate above 95%.

Status
Prospective
Sector
Oil and Gas
Location
Australia
Updated
22 Jul 2026
Source
World Oil

ConstructChat

Ask ConstructChat about Gippsland Decommissioning Campaign #1 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Gippsland Decommissioning Campaign 1 Project” is an infrastructure initiative in the Oil and Gas sector, located in Australia. Taiyo aggregates data on it from World Oil.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Gippsland Decommissioning Campaign #1 Project involves the planned removal of up to 13 offshore platforms starting in 2027 as part of retiring aging offshore infrastructure within the Gippsland Basin Joint Venture. The campaign targets approximately 60,000 tonnes of offshore structures with a recycling rate above 95%.

Original sector

Offshore

Location

Country

Australia

Source

Source

World Oil

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-05-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project