Gippsland Decommissioning Campaign #1
The owner, status and timeline of this project. A free account opens every field.
Source: IndexBox
The Gippsland Decommissioning Campaign #1 Project involves the scheduled removal of up to 13 offshore platforms starting in 2027 as part of a wider program to retire aging offshore infrastructure within the Gippsland Basin Joint Venture. The project includes removing about 60,000 tonnes of offshore structures with a goal of recycling over 95% of recovered materials. ABL Group is contracted to prov
- Status
- Prospective
- Sector
- Energy
- Location
- Australia
- Updated
- 22 Jul 2026
- Source
- IndexBox
ConstructChat
Ask ConstructChat about Gippsland Decommissioning Campaign #1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Gippsland Decommissioning Campaign #1 Project involves the scheduled removal of up to 13 offshore platforms starting in 2027 as part of a wider program to retire aging offshore infrastructure within the Gippsland Basin Joint Venture. The project includes removing about 60,000 tonnes of offshore structures with a goal of recycling over 95% of recovered materials. ABL Group is contracted to provide marine warranty survey services, overseeing marine operations and documentation review during the decommissioning activities. |
Original sector | Energy |
Location
Country | Australia |
Source
Source | IndexBox |
URL |
More Details
Record type | Project |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
