logo

GIRE DU BASSIN DU FLEUVE KAYANGA-GEBA

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

Project

The joint project of Integrated Water Resources Management (IWRM) of the Kayanga-Geba Basin aims to improve the knowledge of Kayanga resources and the establishment of basic tools for integrated and concerted transboundary management of water resources in order to enable local populations to live in harmony with their environment and to ensure their sustainable development. The project fits perfec

Project Information FAQ

Project Information

4 Q
The project “GIRE DU BASSIN DU FLEUVE KAYANGA-GEBA” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The joint project of Integrated Water Resources Management (IWRM) of the Kayanga-Geba Basin aims to improve the knowledge of Kayanga resources and the establishment of basic tools for integrated and concerted transboundary management of water resources in order to enable local populations to live in harmony with their environment and to ensure their sustainable development. The project fits perfectly into the missions of the AWE and the OMVG in terms of IWRM. It enables the creation of a favorable institutional and technical environment for organizing integrated and to promote the development of cooperation between different users. The project consists of the following components: (i) Development of the IWRM Plan in the river catchment area; (ii) Preparation of studies for the hydro-agricultural exploitation of water resources of Geba in Guinea Bissau; (iii) Strengthening the technical and institutional capacities of OMVG and the Member States; (iv) Management of project implementation. Its execution will last 23 months and the corresponding investments are estimated at 1 803 000 Euros. At the end of the project, OMVG will organize a Round Table of Donors in order to mobilize the necessary financing for the implementation of the IWRM Action Plan and the hydro-agricultural development program.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data