logo

GIWW Crossings Water System Upgrade

Sector: Road • Location: Houma, Louisiana, United States of America

Source: Dodge USA

Project
Closed

Work on which proposals are invited consists of the horizontal directional drilling of three HDPE waterlines across the Gulf Intracoastal Waterway at Belanger, Bourg, and Short Streets along with necessary fittings to connect them to the existing water system. Base Bid: Belanger Street 785 linear feet of 12-inch HDPE, Bourg Street 835 linear feet of 16-inch HDPE, and Short Street 835 linear feet o

Status
Closed
Sector
Road, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Houma, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about GIWW Crossings Water System Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GIWW Crossings Water System Upgrade” is an infrastructure initiative in the Road sector, located in Houma, Louisiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work on which proposals are invited consists of the horizontal directional drilling of three HDPE waterlines across the Gulf Intracoastal Waterway at Belanger, Bourg, and Short Streets along with necessary fittings to connect them to the existing water system. Base Bid: Belanger Street 785 linear feet of 12-inch HDPE, Bourg Street 835 linear feet of 16-inch HDPE, and Short Street 835 linear feet of 20-inch HDPE with associated fittings.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Houma

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project