GJAC Lift Station Pump Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Grand Junction Air Center (GJAC) is a wildland fire dispatch center with other operations staff and seasonal smoke jumpers and aircraft to assist with wildland fire control. During fire season they can have as many as 25 staff with frequent long hours and generally a minimal staff to man the radios 24 hours a day, 7 days a week. It has several bathrooms, showers and 2 kitchenette s. It was bui
- Status
- Closed
- Sector
- Waste Processing and Treatment, Aerospace & Defense, Road, Commercial, Water Supply and Storage
- Location
- Grand Junction, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GJAC Lift Station Pump Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Grand Junction Air Center (GJAC) is a wildland fire dispatch center with other operations staff and seasonal smoke jumpers and aircraft to assist with wildland fire control. During fire season they can have as many as 25 staff with frequent long hours and generally a minimal staff to man the radios 24 hours a day, 7 days a week. It has several bathrooms, showers and 2 kitchenette s. It was built in 2005-2006 and is a two-story structure. Due to its location on the compound it is lower tha... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Grand Junction |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Aerospace & Defense, Road, Commercial, Water Supply and Storage |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
