Glade Run Road Bridge Rehabilitation
Sector: Bridge • Location: Ohio, United States of America
Source: Dodge
Design build services for rehabilitation of a steel beam bridge over Deer Creek in its current configuration, also including minor approach reconstruction. The total base bid project length is 0.05 miles. Design build services for rehabilitation of a steel beam bridge over Deer Creek in its current configuration, also including minor approach reconstruction. The total base bid project length is 0.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Design build services for rehabilitation of a steel beam bridge over Deer Creek in its current configuration, also including minor approach reconstruction. The total base bid project length is 0.05 miles. Design build services for rehabilitation of a steel beam bridge over Deer Creek in its current configuration, also including minor approach reconstruction. The total base bid project length is 0.05 miles. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
