Glades Electric - Make Ready Engineering
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
Area of make-ready engineering pertains to the project area as shown in the attached mapping link. This project includes new fiber optic construction that will consist of primarily aerial construction with some underground construction. Aerial facilities on Glades Electric s poles will be placed in the communications space. All aerial facilities will be supported with 1/4 (6mm) strand unless other
- Status
- Closed
- Sector
- Broadband, Power Generation (CCGT), Telecommunications, Commercial, Manufacturing (Industrial)
- Location
- Moore Haven, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Glades Electric - Make Ready Engineering
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Area of make-ready engineering pertains to the project area as shown in the attached mapping link. This project includes new fiber optic construction that will consist of primarily aerial construction with some underground construction. Aerial facilities on Glades Electric s poles will be placed in the communications space. All aerial facilities will be supported with 1/4 (6mm) strand unless otherwise directed. All attachments must meet current NESC clearance standards. Engineering will need ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Moore Haven |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Power Generation (CCGT), Telecommunications, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
