Gladstone State Development Area Energy Hub Project
The owner, status and timeline of this project. A free account opens every field.
Source: The Energy Mix
A project in Queensland combining a 780-megawatt, eight-hour battery energy storage system with up to 1,080 MW of open-cycle gas turbines. It aims to set up long-duration infrastructure batteries to absorb cheap renewables and power large industrial loads, supporting the transition away from coal.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Energy Storage, Power Generation (CCGT)
- Location
- Gladstone, Queensland, Australia
- Updated
- 22 Jul 2026
- Source
- The Energy Mix
ConstructChat
Ask ConstructChat about Gladstone State Development Area Energy Hub Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project in Queensland combining a 780-megawatt, eight-hour battery energy storage system with up to 1,080 MW of open-cycle gas turbines. It aims to set up long-duration infrastructure batteries to absorb cheap renewables and power large industrial loads, supporting the transition away from coal. |
Original sector | Energy |
Location
Country | Australia |
State | Queensland |
City | Gladstone |
Source
Source | The Energy Mix |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Energy Storage, Power Generation (CCGT) |
Article published date | 2025-12-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
