Gladwin Culvert Replacement
Sector: Water Supply and Storage • Location: Lytton, British Columbia, Canada
Source: Dodge
The Work includes the removal of the existing 3 x 2100 mm corrugated steel pipe (CSP) culverts and the supply and installation of a 3900 mm structural plate CSP (SPCSP), a 2100 mm diametre relief culvert, inlet and outlet structures, debris deflector, dissipation pool and channel improvements. Replace damaged infrastructure Channel armoring Rehabilitate roadway approaches
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Steel, Metal
- Location
- Lytton, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Gladwin Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes the removal of the existing 3 x 2100 mm corrugated steel pipe (CSP) culverts and the supply and installation of a 3900 mm structural plate CSP (SPCSP), a 2100 mm diametre relief culvert, inlet and outlet structures, debris deflector, dissipation pool and channel improvements. Replace damaged infrastructure Channel armoring Rehabilitate roadway approaches |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Lytton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Steel, Metal |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
