Glen Carbon Shared Use Path Project
Sector: Car parking • Location: Glen Carbon, Illinois, United States of America
Source: Dodge USA
Installation of a shared-use path along the southeast side of Glen Carbon Road, connecting Schon Park and Route 159. The project consists of three phases, with the first two phases set to begin construction in 2025 and the final phase estimated for completion in 2027.
- Status
- Prospective
- Sector
- Car parking, Road, Government, Manufacturing (Industrial), Automotive, Commercial
- Location
- Glen Carbon, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Glen Carbon Shared Use Path Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Installation of a shared-use path along the southeast side of Glen Carbon Road, connecting Schon Park and Route 159. The project consists of three phases, with the first two phases set to begin construction in 2025 and the final phase estimated for completion in 2027. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Glen Carbon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Manufacturing (Industrial), Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
