Glenaras Gas Project, Queensland

Sector: Commercial • Location: Australia

Source: Hydrocarbon Technology

Project
Closed

Glenaras is a coal seam gas project located in the Galilee Basin in Queensland, Australia. Credit: Galilee Energy. Operator Galilee Energy plans to carry out a three-pilot programme to assess the field’s resources. Credit: Galilee Energy. Glenaras has the potential to supply gas for eight years to the Australian east coast. Credit: Galilee Energy. Glenaras gas field is located in the ATP 2019 perm

Project Information FAQ

Project Information

3 Q
The project “Glenaras Gas Project, Queensland” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Glenaras is a coal seam gas project located in the Galilee Basin in Queensland, Australia. Credit: Galilee Energy. Operator Galilee Energy plans to carry out a three-pilot programme to assess the field’s resources. Credit: Galilee Energy. Glenaras has the potential to supply gas for eight years to the Australian east coast. Credit: Galilee Energy. Glenaras gas field is located in the ATP 2019 permit of the Galilee Basin in central Queensland, Australia. The project is 100% owned by Galilee Energy and is currently in the appraisal stage of development. Front-end engineering and design (FEED) work on the field is expected to commence in 2019, while first gas is slated to be achieved by 2022. The gas project will supply natural gas to the east coast of Australia for a period of six years upon completion. The ATP 2019 permit covers an area of 4,000km² within the Galilee Basin, which was first explored in 1992. The permit contains the Betts Creek and Aramac coal beds located at depths of 900m-1,000m. It is covered by more than 700km of seismic data and has been tested by 12 coreholes, two production pilots and four production wells to date. The field’s 2C and 3C contingent resources are estimated to be 2,508 Petajoules (PJ) and 5,314PJ respectively. The Glenaras gas project will see the evaluation of the quantity and quality of coal seam gas in the Betts Creek and Aramac coal beds. A total of 20 exploration wells have already been drilled on Glenaras, in addition to two multi-pilot wells. The project is expected to entail significantly low development costs due to the low water-treatment costs, as well as the fact that no fracking will be required. Furthermore, it is located close to the market, especially the Barcaldine Power Station and the Cheepie gas pipeline. Previous exploration activities carried out at the field have not been able to achieve pressure drawdown by dewatering the coal due to poor well design. Consequently, pilot production at Glenaras resulted in water production from interbedded sandstones instead of the coals. Despite these issues, Galilee was able to achieve sustained gas production from the Rodney Creek pilot wells in 2011 at rates of up to 200 million standard cubic feet (Mscf) a day. A workover programme for five existing pilot wells that were originally drilled in 2009 was launched in 2015. The programme targeted the thickest seam of the field, R1. Production testing was carried out on the fifth well of the programme, Glenaras 6, which flowed at the rate of 54 million standard cubic feet a day. Laterals were also drilled on Glenaras 5 and Glenaras 3, which are currently producing strong water rates with small amounts of gas. The results from the pilot programme indicate that gas can be produced from interbedded sands without much interference. The findings are also expected help in the field’s development planning. Galilee plans to carry out a multi-lateral pilot programme with the intention of converting the resources into reserves. The programme will include the drilling of three new lateral wells to target coal formations with good permeability, which are located near the existing pilot wells. Glenaras field is already equipped with a number of key assets such as a water storage facility, as well as production gathering and flare facilities. The pilot programme is expected to make use of these facilities, thereby achieving significant cost benefits. Production results from the programme are expected in mid-2018, which will be followed by the initiation of reserve certification process. Galilee plans to commence initial small-scale development using less than 20 wells and a gas plant. The development will supply gas to the Barcaldine Power Station, as well as the domestic market via the Cheepie gas pipeline. Jemena signed an agreement with Galilee in October 2017 to build a pipeline for the delivery of gas from the Glenaras field to the east coast of Australia. The company’s 622km-long Northern Gas Pipeline will be extended via the Galilee Basin under the initiative.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data