Glendale Avenue Bridge Replacements
Pre-design · Mississippi · Last reported Nov 2024
Source: Dodge USA
The City of Hattiesburg and Forrest County are jointly applying for a grant to replace two bridges on Glendale Avenue. One bridge spans the Bouie River, and the other goes over railroad tracks. The bridges are projected to be in poor condition by 2026, and the replacement is estimated to cost $54.2 million.
- Status
- Prospective
- Sector
- Bridge, Road, Commercial, Rail, Government
- Location
- Hattiesburg, Mississippi, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Glendale Avenue Bridge Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The City of Hattiesburg and Forrest County are jointly applying for a grant to replace two bridges on Glendale Avenue. One bridge spans the Bouie River, and the other goes over railroad tracks. The bridges are projected to be in poor condition by 2026, and the replacement is estimated to cost $54.2 million. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Hattiesburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial, Rail, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
