Glendale Hyperion Bridge Improvement Project
Sector: Bridge • Location: Los Angeles, California, United States of America
Source: Bureau Of Engineering, LA city
Glendale-Hyperion Viaduct Complex Improvement Project, Phase 2 The Glendale Boulevard Hyperion Avenue Viaduct Complex, known locally as the Glendale Hyperion Bridge, was completed in 1929. The structure crosses from Atwater Village to Silver Lake, crossing over the 5 Freeway, the Los Angeles River and Riverside Drive. The bridge is located in Council District 13, which is represented by Councilm
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Glendale-Hyperion Viaduct Complex Improvement Project, Phase 2 The Glendale Boulevard Hyperion Avenue Viaduct Complex, known locally as the Glendale Hyperion Bridge, was completed in 1929. The structure crosses from Atwater Village to Silver Lake, crossing over the 5 Freeway, the Los Angeles River and Riverside Drive. The bridge is located in Council District 13, which is represented by Councilmember Hugo Soto-Martinez and in Council District 4, represented by Councilmember Nithya Raman. Built in the late 1920s and early 1930s, the Glendale Hyperion Bridge complex has been designated as a Los Angeles Historic-Cultural Monument. Glendale-Hyperion Viaduct Complex Improvement Project, Phase 2 The $80 million Project, led by the Bureau of Engineering, will upgrade the structure to withstand an earthquake event, restore the bridges historical appearance, and improve circulation and safety for people driving, biking, walking, and rolling. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
