logo

Glendale Hyperion Bridge Improvement Project

Sector: Bridge • Location: Los Angeles, California, United States of America

Source: Bureau Of Engineering, LA city

Project
Active

Glendale-Hyperion Viaduct Complex Improvement Project, Phase 2 The Glendale Boulevard – Hyperion Avenue Viaduct Complex, known locally as the Glendale Hyperion Bridge, was completed in 1929. The structure crosses from Atwater Village to Silver Lake, crossing over the 5 Freeway, the Los Angeles River and Riverside Drive. The bridge is located in Council District 13, which is represented by Councilm

Project Information FAQ

Project Information

5 Q
The project “Glendale Hyperion Bridge Improvement Project” is an infrastructure initiative in the Bridge sector, located in Los Angeles, California, United States of America. Taiyo aggregates data on it from Bureau Of Engineering, LA city.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Glendale-Hyperion Viaduct Complex Improvement Project, Phase 2 The Glendale Boulevard – Hyperion Avenue Viaduct Complex, known locally as the Glendale Hyperion Bridge, was completed in 1929. The structure crosses from Atwater Village to Silver Lake, crossing over the 5 Freeway, the Los Angeles River and Riverside Drive. The bridge is located in Council District 13, which is represented by Councilmember Hugo Soto-Martinez and in Council District 4, represented by Councilmember Nithya Raman. Built in the late 1920s and early 1930s, the Glendale Hyperion Bridge complex has been designated as a Los Angeles Historic-Cultural Monument. Glendale-Hyperion Viaduct Complex Improvement Project, Phase 2 The $80 million Project, led by the Bureau of Engineering, will upgrade the structure to withstand an earthquake event, restore the bridge’s historical appearance, and improve circulation and safety for people driving, biking, walking, and rolling.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data