Glennellen Solar Project
Under construction · New South Wales · Last reported Nov 2025
Source: Renew Economy
The Glennellen solar project is a 200 MW solar farm located 2 kilometres northeast of Jindera in the Riverina region of NSW. It consists of 377,784 solar PV modules and is co-located with sheep grazing. The project is backed by a power purchase agreement with Telstra covering 50% of the output.
- Status
- Under Construction
- Sector
- Raw Materials, Solar, Power Generation (CCGT)
- Location
- Jindera, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- Renew Economy
ConstructChat
Ask ConstructChat about Glennellen Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Glennellen solar project is a 200 MW solar farm located 2 kilometres northeast of Jindera in the Riverina region of NSW. It consists of 377,784 solar PV modules and is co-located with sheep grazing. The project is backed by a power purchase agreement with Telstra covering 50% of the output. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Jindera |
Source
Source | Renew Economy |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Solar, Power Generation (CCGT) |
Article published date | 2025-11-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
