Glenwood Interceptor and Lift Station Modifications
Sector: Water Supply and Storage • Location: Hutto, Texas, United States of America
Source: Dodge USA
Work of the contract includes the furnishing of all labor, material, tools, and equipment for the installation of approximately 130 ft of 66, 248 ft of 54, 225 ft and 48, 5,700ft of 42 and 4,170 ft of 36 diameter wastewater interceptor pipes, 430 ft of 60diameter steel casing using bore and jack method, modifications to the existing Glenwood Lift Station, constructing a 10 x10 junction box with ma
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Hutto, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Glenwood Interceptor and Lift Station Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work of the contract includes the furnishing of all labor, material, tools, and equipment for the installation of approximately 130 ft of 66, 248 ft of 54, 225 ft and 48, 5,700ft of 42 and 4,170 ft of 36 diameter wastewater interceptor pipes, 430 ft of 60diameter steel casing using bore and jack method, modifications to the existing Glenwood Lift Station, constructing a 10 x10 junction box with manually operated 66 and 54 sluice gates and the construction of a temporary lift station at the So... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Hutto |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
