Global Water Farms Pilot Desalination Plant
Sector: Water Supply and Storage • Location: Coachella, California, United States of America
Source: Dodge USA
build a pilot water desalination facility with a one-story, 13,484-square-foot building, a walled and covered salt storage area, ground mounted solar panels, a surface parking area with ADA parking stall, and minor concrete pad for a portable restroom, building access and storm water collection/conveyance on the Project site. A retention basin is proposed on the south side of the building. The bui
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Raw Materials, Solar, Steel, Cement, Car parking, Automotive
- Location
- Coachella, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Global Water Farms Pilot Desalination Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | build a pilot water desalination facility with a one-story, 13,484-square-foot building, a walled and covered salt storage area, ground mounted solar panels, a surface parking area with ADA parking stall, and minor concrete pad for a portable restroom, building access and storm water collection/conveyance on the Project site. A retention basin is proposed on the south side of the building. The building includes a 10,540-square-foot brine tank room with insulated recessed cement foundational h... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Coachella |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Raw Materials, Solar, Steel, Cement, Car parking, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
