Globe Hollow WTP Temporary Finished Water Header
Sector: Water Supply and Storage • Location: Manchester, Connecticut, United States of America
Source: Dodge USA
The existing finished water header receives water from three water treatment plant pumps and conveys water down into a pipe gallery within the plant, then underground to a 24 ductile iron pipe that feeds the Town s water service area. The portion of the header in the pipe gallery needs repair (to be done by Others). To make the repairs, the header must be taken out of service, drained and repaired
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Metal, Government, Steel
- Location
- Manchester, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Globe Hollow WTP Temporary Finished Water Header
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing finished water header receives water from three water treatment plant pumps and conveys water down into a pipe gallery within the plant, then underground to a 24 ductile iron pipe that feeds the Town s water service area. The portion of the header in the pipe gallery needs repair (to be done by Others). To make the repairs, the header must be taken out of service, drained and repaired. The scope of this project is to provide a temporary water header so that the water treatment pl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Manchester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Metal, Government, Steel |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
