Globe Street Water Main Replacement and Paving Restoration
Sector: Metal • Location: Attleboro, Massachusetts, United States of America
Source: Dodge USA
Existing water services from box to main to be removed. From box to house will remain in place. Installation of approximately 350 feet of 6 ductile iron water main from connection with the water main on Bushee Street and terminating at the end of Globe Street past #17 Globe Street. Connection to Bushee Street water main must include installation of tee and valve. Cut and cap of existing 1.5 main a
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Commercial
- Location
- Attleboro, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Globe Street Water Main Replacement and Paving Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Existing water services from box to main to be removed. From box to house will remain in place. Installation of approximately 350 feet of 6 ductile iron water main from connection with the water main on Bushee Street and terminating at the end of Globe Street past #17 Globe Street. Connection to Bushee Street water main must include installation of tee and valve. Cut and cap of existing 1.5 main at Bushee Street. Pressure test and chlorination of new installations is required. Installation of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Attleboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
