logo
ProjectBid Results

Gloryland Road Structure Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

.1 Topsoil stripping and stockpiling. .2 Granular road structure removal and disposal. .3 Subbase removal and disposal. .4 Geotextile supply and installation. .5 Granular supply and installation. .6 Asphalt supply and installation. .7 Topsoil replacement and seeding.

Status
Closed
Sector
Commercial, Road, Government
Location
Slave Lake, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Gloryland Road Structure Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gloryland Road Structure Replacement” is an infrastructure initiative in the Commercial sector, located in Slave Lake, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

.1 Topsoil stripping and stockpiling. .2 Granular road structure removal and disposal. .3 Subbase removal and disposal. .4 Geotextile supply and installation. .5 Granular supply and installation. .6 Asphalt supply and installation. .7 Topsoil replacement and seeding.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Slave Lake

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Road, Government

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project