GLYNCO PKWY FROM E OF CHARING CROSS ROAD TO NOTTING HILL
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
Harry Driggers Boulevard Pedestrian Path Phase II would extend Harry Driggers Boulevard Pedestrian Path Phase I along Glynco Blvd and connect commercial centers and residential subdivisions with a pedestrian friendly transportation option. An 8' wide concrete pedestrian pathway will be constructed. The project begins at the intersection of Glynco Parkway and Charing Cross Road and follows Glynco P
- Status
- Closed
- Sector
- Cement, Residential, Road, Waste Processing and Treatment, Commercial, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about GLYNCO PKWY FROM E OF CHARING CROSS ROAD TO NOTTING HILL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Harry Driggers Boulevard Pedestrian Path Phase II would extend Harry Driggers Boulevard Pedestrian Path Phase I along Glynco Blvd and connect commercial centers and residential subdivisions with a pedestrian friendly transportation option. An 8' wide concrete pedestrian pathway will be constructed. The project begins at the intersection of Glynco Parkway and Charing Cross Road and follows Glynco Parkway for 2095 feet to the intersection of Glynco Parkway and Notting Hill. Crosswalks will be striped and some drainage modifications to facilitate the construction of the path will be performed. This project is being let with PI 0009062 Glynn by the sponsor. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Residential, Road, Waste Processing and Treatment, Commercial, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
