logo
ProjectCompleted

GMP Virtual Power Plant Program

One of 7,161 projects Taiyo tracks in Vermont.

Source: Time

Green Mountain Power has initiated a Virtual Power Plant (VPP) program that leases Tesla Powerwall battery systems to homeowners at below-market rates. This program allows the utility to use the stored energy during peak demand times, contributing to grid stability and reducing reliance on fossil fuels.

Status
Closed
Sector
Power Generation (CCGT), Energy Storage, Power Transmission
Location
Vermont, United States of America
Updated
22 Jul 2026
Source
Time

ConstructChat

Ask ConstructChat about GMP Virtual Power Plant Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GMP Virtual Power Plant Program” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Vermont, United States. Taiyo aggregates data on it from Time.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Green Mountain Power has initiated a Virtual Power Plant (VPP) program that leases Tesla Powerwall battery systems to homeowners at below-market rates. This program allows the utility to use the stored energy during peak demand times, contributing to grid stability and reducing reliance on fossil fuels.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Vermont

Source

Source

Time

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Energy Storage, Power Transmission

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project