logo

GMR Chhattisgarh Energy Private limited (GCEPL)

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

GMR Chhattisgarh Energy Private limited (GCEPL), a subsidiary of GMR Energy, was created to implement 1,370 MW (2 X 685 MW) coal based supercritical power in Raikheda village, Tilda Taluka, Raipur District, Chhattisgarh, India. To develop the project, GMR Energy signed a Project Implementation Agreement with the Government of Chhattisgarh for implementation, operation and maintenance of a 1370 MW

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Geothermal, Manufacturing (Industrial), Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GMR Chhattisgarh Energy Private limited (GCEPL)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GMR Chhattisgarh Energy Private limited (GCEPL)” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

GMR Chhattisgarh Energy Private limited (GCEPL), a subsidiary of GMR Energy, was created to implement 1,370 MW (2 X 685 MW) coal based supercritical power in Raikheda village, Tilda Taluka, Raipur District, Chhattisgarh, India. To develop the project, GMR Energy signed a Project Implementation Agreement with the Government of Chhattisgarh for implementation, operation and maintenance of a 1370 MW Coal based, thermal Power Plant in the state of Chhattisgarh. The MOU was signed in 2007. GCEPL was to sell the electricity output to the regulated market (35%) via a PPA contract with Chhattisgarh State Electricity Board (CSEB), through long term power purchase agreements (35%), and merchant market (30%). The project cost was estimated at Rs82.9 billion (US$1,812.8 million). Financial close was achieved in December 2010 with a debt equity ratio of 75/25, according to company press release. Projectware reported the financial closure of the project in August 2010. Financing comprises a Rs62.17bn 14-year 9months term loan facility and Rs20.73bn equity. In 2013, GMR arranged for additional funding through external commercial borrowing. IIFCL provided two tranches of US$50mn (in June 2013) and US$ 51mn (in November 2013).Both loans had a tenure of 19 years. Construction of the project was delayed due to land acquisition issues. The contract was to be developed on a 40 year Build Own and Operate basis with the concession years starting to count from plant commission date. Expected commissioned date was March 2014.

Original sector

Energy

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Geothermal, Manufacturing (Industrial), Government

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project