GMR Chhattisgarh Energy Private limited (GCEPL)
Sector: Commercial • Location: India
Source: World Bank Group
GMR Chhattisgarh Energy Private limited (GCEPL), a subsidiary of GMR Energy, was created to implement 1,370 MW (2 X 685 MW) coal based supercritical power in Raikheda village, Tilda Taluka, Raipur District, Chhattisgarh, India. To develop the project, GMR Energy signed a Project Implementation Agreement with the Government of Chhattisgarh for implementation, operation and maintenance of a 1370 MW
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Geothermal, Manufacturing (Industrial), Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about GMR Chhattisgarh Energy Private limited (GCEPL)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GMR Chhattisgarh Energy Private limited (GCEPL), a subsidiary of GMR Energy, was created to implement 1,370 MW (2 X 685 MW) coal based supercritical power in Raikheda village, Tilda Taluka, Raipur District, Chhattisgarh, India. To develop the project, GMR Energy signed a Project Implementation Agreement with the Government of Chhattisgarh for implementation, operation and maintenance of a 1370 MW Coal based, thermal Power Plant in the state of Chhattisgarh. The MOU was signed in 2007. GCEPL was to sell the electricity output to the regulated market (35%) via a PPA contract with Chhattisgarh State Electricity Board (CSEB), through long term power purchase agreements (35%), and merchant market (30%). The project cost was estimated at Rs82.9 billion (US$1,812.8 million). Financial close was achieved in December 2010 with a debt equity ratio of 75/25, according to company press release. Projectware reported the financial closure of the project in August 2010. Financing comprises a Rs62.17bn 14-year 9months term loan facility and Rs20.73bn equity. In 2013, GMR arranged for additional funding through external commercial borrowing. IIFCL provided two tranches of US$50mn (in June 2013) and US$ 51mn (in November 2013).Both loans had a tenure of 19 years. Construction of the project was delayed due to land acquisition issues. The contract was to be developed on a 40 year Build Own and Operate basis with the concession years starting to count from plant commission date. Expected commissioned date was March 2014. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Geothermal, Manufacturing (Industrial), Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
