GMR Hyderabad International Airport Limited

Sector: Commercial • Location: Madhya Pradesh, India

Source: World Bank Group

Project
Active

GMR Hyderabad International Airport Limited (GHIAL) signed a 30 year build-own-operate-transfer (BOOT) contract with the Ministry of Civil Aviation, Government of India (GOI) in December 2004, to develop a greenfield international airport at Shamshabad, near the city of Hyderabad, Andhra Pradesh, India. GMR Hyderabad International Airport (GHIA) was designed to have an ultimate capacity of 40 mill

Project Information FAQ

Project Information

5 Q
The project “GMR Hyderabad International Airport Limited” is an infrastructure initiative in the Commercial sector, located in Madhya Pradesh, India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

GMR Hyderabad International Airport Limited (GHIAL) signed a 30 year build-own-operate-transfer (BOOT) contract with the Ministry of Civil Aviation, Government of India (GOI) in December 2004, to develop a greenfield international airport at Shamshabad, near the city of Hyderabad, Andhra Pradesh, India. GMR Hyderabad International Airport (GHIA) was designed to have an ultimate capacity of 40 million passengers per annum. At the time of its opening in March 2008, GHIA was expected to serve 7 million passengers per year. The new international airport was designed to overcome the capacity constraints faced by Hyderabad’s existing airport at Begumpet and to attract foreign investors to the hi-tech city of Hyderabad. Once operational, GHIA was expected to replace the existing airport that handled both domestic and international flights. This BOOT contract was the result of Government of India’s (GOI) commitment to encourage private sector participation to expand India’s airport infrastructure. GOI passed the Airport Authority of India Amendment Act 2003, which defined institutional and legal framework for private investments and paved the way for greenfield airports to be set up in private sector. The project company, GHIAL, was a public-private joint venture between GMR Group (63%), Malaysia Airports Holdings Berhad (MAHB) (11%), Government of India’s Airports Authority of India (13%) and State Government of Andhra Pradesh (GoAP) (13%). The private consortium led by GMR Group was selected as the preferred bidder in an international competitive tender conducted by the GoAP in May 2001. GHIAL was subsequently formed in June 2002. The total cost of the airport was estimated at US$ 399.1 million, including a contingency of US$ 22 million. The project reached financial closure in August 2005, with a debt equity ratio of 1.2:1. The debt totalling US$ 217.7 million was tied-up with IDFC as the lead lender of the consortium. The other participating banks included Allahabad Bank, Bank of Baroda, Canara Bank, IDBI, Oriental Bank of Commerce, State Bank of Hyderabad and Vijaya Bank. The Government of Andhra Pradesh gave a grant of US$ 24.26 million to the project, in addition to an interest free loan of US$ 71.4 million. The remaining funds came in the form of equity from the consortium partners. Airports Authority of India (AAI), the apex statutory organization under the administrative control of Ministry of Civil Aviation, GOI, is responsible for the regulation and management of all the air traffic services in India. Construction began in September 2005 and the airport was expected to begin commercial operations in the first quarter of 2008. Project company, GHIAL's official website - http://newhyderabadairport.com/airways/airway.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data