GMR Hyderabad Vijayawada Expressways Private Limited was created to implement a project to expand from two lanes to four to six lanes 181 km of the Hyderabad – Vijayawada section on NH-9 in the state of Andhra Pradesh. The project also included 2 major bridges, 32 minor bridges, and 174 culverts.

Under the contract, the consortium was responsible for the design, construction, finance, operatio

Project Information FAQ

Project Information

4 Q
The project “GMR Hyderabad Vijayawada Expressways Private Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

GMR Hyderabad Vijayawada Expressways Private Limited was created to implement a project to expand from two lanes to four to six lanes 181 km of the Hyderabad – Vijayawada section on NH-9 in the state of Andhra Pradesh. The project also included 2 major bridges, 32 minor bridges, and 174 culverts. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and widening of the existing two-lane highway to a four-lane highway with paved shoulders. The expansion project, part of National Highway Development Project Phase - III, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. GMR Hyderabad Vijayawada Expressways Private Limited was an SPV owned by GMR Infrastructure Limited (74%) and Punj Lloyd Limited (26%). The National Highway Authority awarded the project to GMR on a Build, Operate and Trasfer (Toll) basis on a 25 year concession (including construction period) through an international competitive bidding route. The consortium was one of the five bidders for the highway project, which was caught in controversy after several rounds of litigation in the Delhi high court and the Supreme Court of India over who would be allowed to place bids for the project. GMR won the tender through competitive bidding, conducted by NHAI, by quoting the maximum revenue share with the Government. The winning consortium committed to share 31% of the revenue in the first year with an annual increment of one percentage point for the duration of concession period of 25 years. Under the contract, GMR was to recover the capital costs and operating costs including returns through tolling during the term of concession. Further details of bidding were not available at the time of collection of this information. The letter of award was issued in May 2009. The concession agreement was signed in January 2010. The project cost was estimated to be INR17.5 billion (US$382.7 million). The project reached contractual closure in April 2010, with a debt component of INR17 billion. IDBI Bank was underwritten the loan. Construction began in October 2009 and was expected to conclude in October 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data