logo

GNLC SA (Calidda)

Sector: LNG • Location: Lima, Peru

Source: World Bank Group

Project
Active

Gas de Camisea para Lima y Callao (GNLC) was created in May 2002 to distribute natural gas to the Peruvian regions of Lima and Callao. GNLC was created as part of the Camisea Project, Peru's largest natural gas project. The Camisea Project comprises the extraction, transportation, consumption,and export of gas (both liquified natural gas and natural gas). The Camisea Project faced strong oppositi

Status
Prospective
Sector
LNG, Natural Gas, Commercial, Government
Location
Lima, Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GNLC SA (Calidda)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GNLC SA (Calidda)” is an infrastructure initiative in the LNG sector, located in Lima, Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Gas de Camisea para Lima y Callao (GNLC) was created in May 2002 to distribute natural gas to the Peruvian regions of Lima and Callao. GNLC was created as part of the Camisea Project, Peru's largest natural gas project. The Camisea Project comprises the extraction, transportation, consumption,and export of gas (both liquified natural gas and natural gas). The Camisea Project faced strong opposition from environmental and human rights groups concerned with the project's location in the Peruvian Amazon. Tractabel, part of SUEZ, is the primary sponsor in the consortium; Puntahuacaluna of Peru has a minority stake. It was expected that 200,000 customers would be connected to the line within the first six years of operation. Operations were expected to commence in August 2004 and initial gas supply was expected to be 2.6 billion cubic meters per year. In June 2007, SUEZ Energy International transfered its shares to Ashmore Energy and Promigas in return for a 51% stake in Panama's 280 MW Central Termica Bahia Las Minas. In March 2010, IFC approved a US $40 million A Loan and a $10 million C loan from IFC’s own account for the phase I of the expansion of Calidda’s distribution network, designed to increase the distribution capacity of natural gas in the concession area from 255 to 420 million standard cubic feet per day. The total Project cost was calculated at US $236 million, and was to include: (i) the expansion and upgrades to the main grid, (ii) the expansion to the low pressure secondary grid, and (iii) refinancing of existing senior debt. Empresa de Energia de Bogota (EEB) purchased a 60% stake in the project in February 2011.

Original sector

Energy

Procurement method

Budget

Location

Country

Peru

State

Lima

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

LNG, Natural Gas, Commercial, Government

Article published date

2024-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project