logo

GNLC SA (Calidda)

Sector: LNG • Location: Peru

Source: World Bank Group

Project
Active

Gas de Camisea para Lima y Callao (GNLC) was created in May 2002 to distribute natural gas to the Peruvian regions of Lima and Callao. GNLC was created as part of the Camisea Project, Peru's largest natural gas project. The Camisea Project comprises the extraction, transportation, consumption,and export of gas (both liquified natural gas and natural gas). The Camisea Project faced strong oppositi

Project Information FAQ

Project Information

5 Q
The project “GNLC SA (Calidda)” is an infrastructure initiative in the LNG sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Gas de Camisea para Lima y Callao (GNLC) was created in May 2002 to distribute natural gas to the Peruvian regions of Lima and Callao. GNLC was created as part of the Camisea Project, Peru's largest natural gas project. The Camisea Project comprises the extraction, transportation, consumption,and export of gas (both liquified natural gas and natural gas). The Camisea Project faced strong opposition from environmental and human rights groups concerned with the project's location in the Peruvian Amazon. Tractabel, part of SUEZ, is the primary sponsor in the consortium; Puntahuacaluna of Peru has a minority stake. It was expected that 200,000 customers would be connected to the line within the first six years of operation. Operations were expected to commence in August 2004 and initial gas supply was expected to be 2.6 billion cubic meters per year. In June 2007, SUEZ Energy International transfered its shares to Ashmore Energy and Promigas in return for a 51% stake in Panama's 280 MW Central Termica Bahia Las Minas. In March 2010, IFC approved a US $40 million A Loan and a $10 million C loan from IFC’s own account for the phase I of the expansion of Calidda’s distribution network, designed to increase the distribution capacity of natural gas in the concession area from 255 to 420 million standard cubic feet per day. The total Project cost was calculated at US $236 million, and was to include: (i) the expansion and upgrades to the main grid, (ii) the expansion to the low pressure secondary grid, and (iii) refinancing of existing senior debt. Empresa de Energia de Bogota (EEB) purchased a 60% stake in the project in February 2011.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data