logo
ProjectActive

GNPower Mariveles Coal Power Plant

Active · Philippines

Source: World Bank Group

GNPower Mariveles Coal Plant Ltd. Co. was created to build and operate a 600 MW (2x300 MW) coal fired power plant capacity in Bataan, on the island of Luzon, Philippines. Initially the plant was planned as 1,200 MW LNG power plant but change to a 600 MW coal fired power plants in 2007. GNPower Mariveles Coal Plant Ltd. Co. was a subsidiary of GN Power, which operated power plants and had licenses

Status
Prospective
Sector
LNG, Power Generation (CCGT), Government, Commercial
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about GNPower Mariveles Coal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “GNPower Mariveles Coal Power Plant” is an infrastructure initiative in the LNG sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

GNPower Mariveles Coal Plant Ltd. Co. was created to build and operate a 600 MW (2x300 MW) coal fired power plant capacity in Bataan, on the island of Luzon, Philippines. Initially the plant was planned as 1,200 MW LNG power plant but change to a 600 MW coal fired power plants in 2007. GNPower Mariveles Coal Plant Ltd. Co. was a subsidiary of GN Power, which operated power plants and had licenses for retail electricity supply from the Energy Regulatory Commission (ERC). This plant was the first phase of a GN Power's plans for 2,100MW. GN Power was a joint venture among Sithe Global, Power Partners, PMR Holding Corporation and US-based Denham Capital Management. The power plant was conceived and developed by the private sponsors. It was the first plant to be implemented without any government support in the Philippines. The project company signed several long term power purchase agreements with numerous off-takers including Manila Electricity Co. (MERALCO) and Dagupan Electricity Corp between 2007 and 2009. The project cost was estimated to be US$1000 million. The project reached financial closure in January 2010 with US$493m 16-year term loan and US$$227m 12-year term loan in debt and US$$280m in equity. The US$493m loan was arranged by China Development Bank (CDB) and the US$280 million loan by Filipino Banco de Oro Unibank Inc (BDO). GN Power signed an EPC contract with CNEEC [China] on Feb. 6, 2009. The Engineering, Procurement and Construction counterparty is CNEEC (China). Construction started on 29 Jan 2010 and operation was expected to start on 29 March 2013.

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

LNG, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project