logo

GNV TOWB Parking Lot Replacement

Sector: Aerospace & Defense • Location: Gainesville, Florida, United States of America

Source: Dodge USA

Project
Closed

The Federal Aviation Administration (FAA) has a requirement for the refurbishment and replacement of the parking lot, gutters, curbs, and sidewalks at the (GNV ATCT) The following list summarizes key elements of the work. The contractor is responsible for accomplishing all items of work in accordance with the site conditions, applicable drawings, previous reports/specifications, building codes, in

Status
Closed
Sector
Aerospace & Defense, Airport, Commercial, Manufacturing (Industrial), Car parking, Automotive
Location
Gainesville, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about GNV TOWB Parking Lot Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GNV TOWB Parking Lot Replacement” is an infrastructure initiative in the Aerospace & Defense sector, located in Gainesville, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Federal Aviation Administration (FAA) has a requirement for the refurbishment and replacement of the parking lot, gutters, curbs, and sidewalks at the (GNV ATCT) The following list summarizes key elements of the work. The contractor is responsible for accomplishing all items of work in accordance with the site conditions, applicable drawings, previous reports/specifications, building codes, industry standards, and general conditions of the contract. Any additional labor, materials, equipm...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Gainesville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Airport, Commercial, Manufacturing (Industrial), Car parking, Automotive

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project