GO Repair Concrete Storage Tank
Sector: Water Supply and Storage • Location: Greenup, Kentucky, United States of America
Source: Dodge USA
This project involves removal of the existing potable water treatment plant and concrete storage tank at Greenbo State Park in Greenup County, KY. Construction of a new water storage tank on the existing site, reconnection of the city water supply t the tank, and new SCADA controls between the remotely located city water tank fill valve, the new tank level controller, and the main SCADA communicat
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Consumer Products, Raw Materials, Commercial, Car parking, Hotel, Power Generation (CCGT), Automotive
- Location
- Greenup, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GO Repair Concrete Storage Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves removal of the existing potable water treatment plant and concrete storage tank at Greenbo State Park in Greenup County, KY. Construction of a new water storage tank on the existing site, reconnection of the city water supply t the tank, and new SCADA controls between the remotely located city water tank fill valve, the new tank level controller, and the main SCADA communications controller located in the lodge mechanical room on the same site. Electrical power modificat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Greenup |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Consumer Products, Raw Materials, Commercial, Car parking, Hotel, Power Generation (CCGT), Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
