Goddard Park Upgrades - Electrical
Sector: Power Generation (CCGT) • Location: Auburn, Massachusetts, United States of America
Source: Dodge USA
The work includes the removal of existing lighting, 100-amp service and cabinet. Replacing NEMA 3R cabinet and install a new 100 amp 3-phase service to the existing pole, provide new conduit, cable, meter socket, and panel. Re-using existing conduits, if possible, for site lighting, supply new hand holes, conduit, and wire. The Town of Auburn will supply walkway post lights. Replacement of lightin
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Commercial, Telecommunications, Government, Car parking, Automotive
- Location
- Auburn, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Goddard Park Upgrades - Electrical
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the removal of existing lighting, 100-amp service and cabinet. Replacing NEMA 3R cabinet and install a new 100 amp 3-phase service to the existing pole, provide new conduit, cable, meter socket, and panel. Re-using existing conduits, if possible, for site lighting, supply new hand holes, conduit, and wire. The Town of Auburn will supply walkway post lights. Replacement of lighting in and around rocket fountain, install new conduit and wiring for new 7.5 HP pump in chamber wi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Auburn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Commercial, Telecommunications, Government, Car parking, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
