Gode Wind 3 Offshore Wind Farm
Sector: Commercial • Location: Lower Saxony, Germany
Source: Offshore Engineer Magazine
The Gode Wind 3 offshore wind farm, developed by Ørsted and Nuveen Infrastructure, has started commercial operations with an installed capacity of 253 MW, capable of supplying renewable power to approximately 250,000 households. The project is Ørsted's fifth operational offshore wind farm in Germany, contributing to the country's transition to green energy.
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Raw Materials, Wind
- Location
- Lower Saxony, Germany
- Updated
- 22 Jul 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Gode Wind 3 Offshore Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Gode Wind 3 offshore wind farm, developed by Ørsted and Nuveen Infrastructure, has started commercial operations with an installed capacity of 253 MW, capable of supplying renewable power to approximately 250,000 households. The project is Ørsted's fifth operational offshore wind farm in Germany, contributing to the country's transition to green energy. |
Original sector | Renewable Energy |
Location
Country | Germany |
State | Lower Saxony |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Raw Materials, Wind |
Article published date | 2025-03-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
