GOGA 3113
One of 10,000+ projects Taiyo tracks in Colorado.
Source: Dodge USA
CM firm shall provide 1215 calendar days of construction management services. Exact dates of performance have yet to be determined and are dependent upon start of construction activities. The construction contract performance period is 1140 calendar days after issuance of the Notice to Proceed (NTP).
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Denver, Colorado, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GOGA 3113
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | CM firm shall provide 1215 calendar days of construction management services. Exact dates of performance have yet to be determined and are dependent upon start of construction activities. The construction contract performance period is 1140 calendar days after issuance of the Notice to Proceed (NTP). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Denver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
