logo
ProjectClosed

GOH Conversion Gösserhalle / AllesWirdGut Architektur

Sector: Geothermal • Location: Aline Schmidt, Johannes Windbichler, Karolina Pettikova, Teresa Aćimović

Source: ArchDaily

Text description provided by the architects.Of brewing and building, from yesterday into tomorrow – the history of the so-called Gösserhalle in Favoriten,Vienna’s 10th district, is a checkered one. Ever since its construction the industrial building, originally built as a workshop premises by the ÖBB before 1900, then converted into a beer warehouse for the famous Gösser company in the middle of t

Status
Closed
Sector
Geothermal, Stadium, Warehouse, Residential, Manufacturing (Industrial), Commercial
Location
Austria
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about GOH Conversion Gösserhalle / AllesWirdGut Architektur

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “GOH Conversion Gösserhalle / AllesWirdGut Architektur” is an infrastructure initiative in the Geothermal sector, located in Aline Schmidt, Johannes Windbichler, Karolina Pettikova, Teresa Aćimović. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Text description provided by the architects.Of brewing and building, from yesterday into tomorrow – the history of the so-called Gösserhalle in Favoriten,Vienna’s 10th district, is a checkered one. Ever since its construction the industrial building, originally built as a workshop premises by the ÖBB before 1900, then converted into a beer warehouse for the famous Gösser company in the middle of the last century and most recently repurposed as an event venue, has, with its distinctive façade with clinker-clad wide arches defined the character of its urban quarter. This identity-forming brickwork structure was now taken into the future.The differential between the former building depth and the new skin creates a surprising, luxurious tension-loaded three-meter interval, which, through the correlations it facilitates, seeks to evoke magical moments like just right before a kiss. That in-between space is a gift and will be developed concerning design, ecological, economic, and pragmatic aspects. The concept relies on prefabricated modular elements and a mix of materials consisting of wood, clinker, and metal.The design outlines a synthesis of respectfully preserved existing and leading-edge new architecture: Careful considerateness and consistently modern typology converge in a made-to-measure project that lets a freely natural, welcoming in-between take root in the center of an urban design task.Utilizing the existing structure in a very mindful way, the project strikes a balance between urban design stipulations and the needs of future use—and embarks on a radical intervention in the process: While the exterior walls of the old Gösserhalle were preserved, the existing roof was pulled down to create optimal conditions for a new three-story building that accommodates office spaces and a restaurant and is enclosed by the historical walling.

Location

Country

Austria

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Geothermal, Stadium, Warehouse, Residential, Manufacturing (Industrial), Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project